What is the quickest and easiest method to protect against residual screed moisture?
With UZIN L3 Gold Moisture Control System.
When installing flooring in areas where subfloor moisture is a problem, traditional damp proofing methods can take as long as 1 or 2 days. With the UZIN L3 Gold Moisture Control System floors can be installed in as little as 4 hours and is ideal for projects with time constraints or refurbishment work. The system has been developed to improve UZIN L3 Gold in areas of high moisture (up to 90% RH with 1 coat of primer or up to 95% RH with 2 coats) and is exceptionally simple to use. The quickest and easiest system to protect against residual screed moisture.

Video:
UZIN L 3 Gold System Primer System Primer
Primer for UZIN L3 Gold Moisture Control System
- simple handling
- very rapid drying
- no quartz sand sprinkling
UZIN L3 Gold Moisture Control Rapid Drying 2 Part Smoothing Compound
Two component smoothing compound for use in areas of high residual moisture
- For use in areas of high residual moisture
- Ammonia and latex free
- Suitable for thickness from 3 – 5 mm
- Excellent flow
- Excellent adhesion and bond strength
- Ready for floor covering in approx 2 hours
- Very low stress
- Absorbent providing a good key for adhesives