How can concrete crack repair be quick and easy?
With UZIN RR 203 and UZIN NC 182.
Cracks and concrete expansion joints must be closed prior to the installation of the new floor covering. While expansion joints have been deliberately made in the surface, cracks represent damages which may have different causes. In order to avoid the joints and cracks showing through the floor, they must be closed. Combining UZIN NC 182 rapid repair and UZIN RR 203 crack bridge is a proven system and suitable for both expansion joint and concrete crack repair.

UZIN NC 182 Re-workable Low Slump Repair Mortar
Moisture-resistant, low-slump and rapid repair mortar with reActivate effect for any range of thickness
- ready to accept floor coverings after 60 minutes*
- re-mixable, longer working time
- resistant against alkaline moisture
- fine grain, no visible patching marks
UZIN PE 360 PLUS Ready Mixed Primer
Moisture tolerant dispersion-based primer for absorbent substrates, screeds and concrete
- ready mixed
- very economical
- rapid drying
- reduces the absorbency of the substrate
tolerant against alkaline moisture
UZIN RR 203 Crack Bridge
Fibreglass crack reinforcement system for repairing cracks, area separation joints and movement on different substrates.
- Extremely high tensile strength and tear-resistant
- Bridges and reinforces cracks, joints and transitions
- Extremely easy to install
- Panel product saves time
- Very high composite strength