Which quick drying cement is best to reduce the drying times of screeds?
UZIN SC 980.
Screeds can have a drying time of at least 28 days. When using standard cements or calcium sulphate screeds, the drying time maybe much longer due to high thicknesses. The solution for shortening the drying times comes with the low shrinkage quick dry cement UZIN SC 980. It consists of a rapid setting special binding agent, which also ensures minimal shrinkage and creates a low stress screed. Regardless of the floor covering, the surface is ready for covering after 24 hours*. Thanks to its reduced shrinkage, joint-free areas up to 200 m² are possible.
*At >10 °C and 80% relative humidity.

Video:
UZIN SC 980 Low-Shrink Rapid Cement
Accelerated special cement for producing low-shrinkage, dimensionally stable screeds for interior and exterior use
- low stress
- helps reduce cracks and shrinkage
- joint-free areas up to 200 m²
- quick drying even with unfavourable climatic conditions
- high strength
- heat drying after 3 days