Want peace of mind on a prestigious project? Simply turn to UZIN.
Data
Building type | Public buildings (UK) Leisure and sports complexes (UK) |
---|---|
Area | 600 m2 |
Country | United Kingdom |
Wigan Youth Zone is at the centre of the community and aims to help young people develop real and achievable aspirations. UZIN products were used to install 600m2 of new safety flooring following a refurbishment of the Youth Centre in 2013. The flooring contractor, iFloor UK Ltd turned to UZIN because minimising risk was essential on such a prestigious project which involved installing an intricate flooring design at the heart of the building.
UZIN provide fail safe installation systems and low emission products which are required in sensitive environments such as youth centres. Firstly UZIN PE 280, a rapid primer was first applied to the floor before UZIN NC 160, a heavy duty levelling compound was installed. UZIN KE 66, a fibre reinforced adhesive was then used to install the safety floor covering. The elaborate pattern incorporated different colours and the subsequent finish was outstanding. The feedback from the client was also great and iFloor UK Ltd ended up completing several additional areas as a result.